How To Install A 5. Amp 2- Pole Circuit Breaker To Power A Sub- Panel. In This Article. Related Articles. Project Date: Start > > [See Tools and Materials][Add your. In The Basement: This is the main breaker panel, in. This 2. 00 Amp panel was installed two years ago during. The brown material is just a. The electrical inspector requested. Main Panel: I removed the metal cover and the.
The coiled- up large black cable (red arrow) is the. We left one large knock- out for the. But.. when we ran these wires, we had. ![]() This cable. needs to enter the main panel at arrow 1, so we had to. We installed a 3/4 inch cable clamp (red. This clamp is just big enough for the 6- 3. G sub- feed. cable. From time to time, circuit breakers within your electrical panel get weak or go bad. Learn how to safely remove and install a circuit breaker. ![]() There was just enough room on the top of. I doubt that a larger clamp. We fished the 6- 3 cable (red arrow). ![]() Then we stripped away the cable jacket and. We routed the ground wire around the. We connected the ground and the neutral. Note: It's ONLY at the MAIN panel. At the sub- panel, the neutral bus needs to be. Then we ran the two hot wires around the. We stripped about 1/2" of insulation. We connected the red and black hot wires. Amp 2- pole circuit breaker. This is what many people call a "2. Volt" breaker. (Actually, the voltage is no longer 2. Volts.. now. it's 2. Volts.)There is 2. Volts between the two hot wires, and 1. Volts between each hot wire and neutral. We installed the breaker in the main panel: The first step for this Cutler- Hammer breaker is to. At this point the metal contacts were not yet seated. Arrow 1 points to one of the connectors on. Arrow 2 points to one of the hot bus bar tabs. This connection is simply a press fit. The breaker. connectors are spring- loaded and squeeze against the tab.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
November 2017
Categories |